Grunau upgraded the heating and ventilation system at this Madison VA hospital. To avoid jeopardizing current research projects at this medical facility, Grunau was given a 24-hour window to shut down the old and start the new equipment. With coordination, preplanning, and innovative thinking, Grunau completed the final tie-ins and exchange within 10 hours.
Grunau Location: Wisconsin Office
Owner: US Dept of Veteran Affairs
Contractor: C3T
Architect: Chequamegon Bay Engineering
Engineer: Henneman Engineering
Case Study: WIlliam S Middleton Memorial Veterans Hospital ~ Madison Case Study
Completed: June 2013